Close Menu
DriveFast.com.my
  • Latest Auto
  • 4Wheels
  • 2Wheels
  • Test Drive
  • Auto Mods
  • Autotainment
  • Fast Talk
  • Accessories
  • PR NewsWire
Facebook Instagram YouTube TikTok Threads
  • Home
  • Editorial
  • Advertising
  • Contact Us
  • Privacy Policy
  • PanduLaju.com.my (Bahasa Malaysia)
Facebook Instagram YouTube TikTok Threads
DriveFast.com.my
  • Latest Auto
  • 4Wheels
  • 2Wheels
  • Test Drive
  • Auto Mods
  • Autotainment
  • Fast Talk
  • Accessories
  • PR NewsWire
DriveFast.com.my
Home » MAHB Slaps RM9.1 Million Penalty on KLIA Aerotrain Project Contractor for Missing Completion Deadline
Latest Auto

MAHB Slaps RM9.1 Million Penalty on KLIA Aerotrain Project Contractor for Missing Completion Deadline

DriveFast TeamBy DriveFast Team27/02/2026No Comments2 Mins Read
Facebook Twitter Telegram Threads
Share
Facebook Twitter LinkedIn Telegram Threads

KLIA Aerotrain Malaysia MAHB Penalty Contractor

Malaysia Airports Holdings Bhd (MAHB) has imposed a Liquidated and Ascertained Damages (LAD) penalty totalling RM9.1 million on the KLIA Aerotrain project contractor, ALSTOM IJM Construction Sdn Bhd and Pestech Technology Sdn Bhd (IJMC-Pestech Joint Venture).

The Ministry of Transport Malaysia (MOT), in a written reply published on the Dewan Rakyat website, confirmed that the action was taken following the contractor’s failure to complete the new aerotrain system at Kuala Lumpur International Airport (KLIA) according to the agreed schedule.

RM100,000 Per Day for 91 Days

According to MOT, the LAD penalty was imposed over 91 days from 1 April 2025 to 30 June 2025.

“As stipulated in the contract, the LAD amount imposed is RM100,000 per day, bringing the total to RM9.1 million,” the statement read.

System Confirmed Safe and Operational

MAHB Logo Malaysia Airports

MAHB has previously confirmed that an independent rail assessor has verified the KLIA Aerotrain system is now operating as intended.

According to the assessment, service disruptions experienced since the system first came into operation are considered normal for a complex rail system of this nature and do not pose any safety risks — given the engineering controls and continuous monitoring measures that have been put in place.

Source: Astro Awani

DriveFast Team
  • Website

Related Readings

Latest Auto

Sime Motors’ Inokom Plant Now Assembles for Six Brands with 100% Local Workforce

24/06/2026
Latest Auto

Subsidised Diesel Price to Go Down to RM2.10 per Litre from July 2026

22/06/2026
Latest Auto

Nizra Auto Inaugurates New Jetour Damansara Showroom

21/06/2026
Latest Auto

Perodua Service Maintenance Parts, Labour Prices Down by 10%

18/06/2026
Leave A Reply Cancel Reply

  • Facebook
  • Instagram
  • TikTok
Reader Favourites This Week
Latest Auto

Nizra Auto Inaugurates New Jetour Damansara Showroom

By Mukhlis Azman21/06/20260
Accessories

YOHE Helmets Launched in Malaysia with Four New Models, From RM319

By Mukhlis Azman11/04/20260
Latest Auto

Sime Motors’ Inokom Plant Now Assembles for Six Brands with 100% Local Workforce

By Mukhlis Azman24/06/20260
2Wheels

#KLIMS2026: Suzuki SV-7GX Previewed in Malaysia – Launching Soon?

By Mukhlis Azman22/06/20260
Facebook Instagram YouTube TikTok Threads
  • Latest Auto
  • 4Wheels
  • 2Wheels
  • Test Drive
  • Auto Mods
  • Autotainment
  • Fast Talk
  • Accessories
  • PR NewsWire
© 2026 DriveFast.com.my · GYL Media Services Sdn Bhd (1257406-V)
designXCII TECH

Type above and press Enter to search. Press Esc to cancel.

Loading Comments...